Construction Progress Filming: Drone and Timelapse

Construction site drone filming shows what stage the build has reached today and leaves no room for argument. When shots taken from the same point at regular intervals are put together, the result is the accelerated progress film known as a construction timelapse: the journey from empty plot to finished building can be watched in a minute or two. At Kavron Media we provide periodic aerial filming, progress videos and an archive service for building firms in Manavgat, Side, Alanya and Antalya.

Who benefits from progress filming?

The question a company selling flats off plan hears most often is how the build is getting on. If the buyer lives in another city or another country, they cannot come and look at the site. A short aerial clip sent every month answers the question before it is asked and lightens the sales team's load on the phone.

The second benefit is the company's own records. The date each floor went up, how the site was organised and where materials were stacked are all archived on film. The third benefit is marketing: the film of the finished building becomes far more striking with a sequence that shows how it rose from start to finish.

How is drone progress filming set up?

On the first flight we fix several vantage points around the site: a high point for the overall view, the front elevation, the rear elevation and, where there is one, the direction of the view. The position, height and camera angle of each point are recorded. On every later visit the drone goes to the same points and takes the same frame again.

Without that discipline a timelapse does not work. If the angle drifts between frames the film judders and is tiring to watch. In the edit we align the frames on top of one another and smooth out the differences in light and colour; even so, the real work is done on site, capturing the same frame every time. Alongside the fixed frames we also film a free-moving video circling the site on each visit.

Fixed camera or periodic drone?

Two methods come to mind when timelapse is mentioned. The first is a fixed camera installed at a point overlooking the site that takes photographs at set intervals for months. It gives a very smooth result, but it needs a suitable place to mount the camera, uninterrupted power, protection and regular maintenance.

The second is periodic drone filming, which is what we recommend for most projects. It needs no installation, covers more than one angle and also produces promotional footage on every visit. It is not as smooth as a fixed camera, but it is more than adequate for social media and for keeping clients informed. For projects that want a long-term fixed camera installation, we assess the scope separately during the recce.

How is the filming frequency decided?

We draw up the schedule with your site manager, following the programme of works. Extra visits can be planned for important days such as a concrete pour, the erection of a crane or the completion of the cladding.

  • Excavation and foundations: change is rapid but visually horizontal; infrequent filming may be enough.
  • Structural frame: as the floors rise the difference shows every week; this is when we film most often.
  • Façade and roof: visual turning points, such as the scaffolding coming down, must not be missed.
  • Fit-out: change is less visible from outside; aerial filming becomes less frequent and interior footage takes over.
  • Landscaping and handover: a closing flight is made to film the final state in the best light.

Flight permits, safety and privacy

Flying on a construction site is different from flying over open land. Tower cranes, concrete pumps, power lines and neighbouring buildings are both obstacles and risks. We set the flight time in coordination with the crane operator and the site manager, and we do not fly over workers unnecessarily.

Under the rules of SHGM, the civil aviation authority, the flight zone the address falls in and any permit requirement are checked before the first shoot; on long-running projects we repeat this check from time to time because the status of a zone can change. We take care that the windows and gardens of homes on neighbouring parcels do not appear in the footage in detail. This explanation is general information and not legal advice; the current requirements should be confirmed from SHGM's official sources.

What do we deliver after each visit?

  1. Date-stamped photographs from the fixed vantage points.
  2. A short current-status video circling the site.
  3. A vertical cut with the company logo, ready to share on social media.
  4. A side-by-side comparison image with the previous visit, on request.
  5. At the end of the project, an accelerated progress film compiled from all the visits.

Using the footage in marketing

If progress footage is simply filed away, half its value is lost. Sending the monthly video to flat owners as a message, adding it to the project page in date order and sharing it on social media under a construction diary heading both reassures existing buyers and persuades those who are undecided.

For companies that sell to foreign buyers this is worth even more: the person watching from afar sees with their own eyes the building they have put their money into going up. When the project is complete, the progress film becomes a concrete reference at the launch of the company's next development, showing that it carries out its work on schedule.

What needs to be settled before we start

  • The estimated duration of the project and the stage it has reached.
  • Who the footage will be sent to: internal use only, buyers, or the general public.
  • The contact person on site and the suitable flight times.
  • Any areas or neighbouring buildings that should not appear in the film.
  • Who will hold the archive and for how long.

Frequently asked questions

Does a construction timelapse have to start at the very beginning of the build?

The best result comes from starting with the empty plot, because the film then shows the greatest change. But it is also possible to start on a build that is already under way. In that case we look together for ways of using your older photographs or the project visuals for the opening of the film.

How often should filming take place?

It depends on the pace of the build and the budget. Visits become more frequent while the structure is rising quickly and less frequent during fit-out. Rather than imposing a fixed number, we prepare a flexible schedule based on your programme of works and leave the option of extra flights for important days.

What happens on a windy or rainy day?

We do not fly in unsafe weather. The shoot is moved to the nearest suitable day. For a timelapse, a shift of a few days causes no problem; what matters is keeping the same angle and, if possible, a similar time of day.

Who owns the footage?

Your company uses the delivered photographs and videos as it wishes for promotion and information. We state clearly in the contract how long the raw footage will be kept and in what form it will be delivered; on long projects we recommend that you keep a copy of the archive as well.

Can progress filming replace a technical progress payment report?

No. The footage we produce is for promotion and information; it is not a measurement, a bill of quantities or an engineering report. It can be used as a visual appendix supporting your technical team's reports, but it does not take their place.

Do you also film at ground level inside the site?

Yes. Aerial footage shows progress from the outside; during fit-out the real change is indoors. In the safe areas indicated by the site manager, and wearing protective equipment, we film short interior videos and take detail photographs.